Delivering Power to Progress
At Top Arabian Island Construction Co. (TAICON), every project reflects our commitment to engineering excellence, safety, and on-time delivery.
Since our inception in 2005, we have successfully completed numerous Overhead Transmission Line (OHTL), Substation, and Infrastructure projects across the Kingdom of Saudi Arabia, serving top clients such as SEC, NCC, SSEM, LTSA, NPCC, KEC, Alfanar, and STC.
We continue to support the Kingdom’s Vision 2030 by executing critical projects that strengthen Saudi Arabia’s power network and industrial infrastructure.
Ongoing Projects (2024–2025)
Construction of Two (2) 380 KV D/C OHTL’s — Khushaybi PV BSP to Qassim 2 BSP and Henakiya BSP (Ckt 1 & 2)
Scope: Tower erection, stringing, and line construction across dual 380kV circuits.
380kV OHTL from Sadawi 380/115kV BSP to Nariya North 380kV BSP
Scope: Full erection, tightening, and stringing works connecting BSP substations in the Eastern Region.
Construction of 380kV D/C OHTL — Khushaybi PV BSP to Afif BSP 9081 & Dawadmi BSP 9037
Scope: Erection and stringing of double-circuit 380kV lines for grid expansion in Central Saudi Arabia.
Completed Projects (2016–2024)
Major 380kV & 230kV Projects
Tower Erection & Stringing of 400kV OHTL — Al Wafra (Kuwait) to Al Fadhili (KSA) GCCIA Project
Construction of One (1) 380kV D/C OHTL Between Mowaih PV BSP and MHD BSP
Tower Erection — 380KV Double Circuit Line from Yanbu Central (YCNT) BSP to Umlujj North (UMN) BSP
Construction of One (1) 380kV D/C OHTL — LILO Between New Afif BSP #9081 and 9006/9037 BSP
380kV OHTL Between KHAFJI BSP and NARIYAH NORTH BSP
380kV OHTL Between SWPC 3B S/S to Jubail Residential BSP & SWPC 3B S/S to SWPC 3A S/S
132kV & 230kV Transmission Line Projects
132kV DC OHTL — New Hail South S/S 8910 to BSP S/S 9039 (Hail Area)
132kV DC OHTL — New Marjan BSP to Safaniya BSP / Tanajip 380kV S/S
380kV D/C OHTL — Marjan BSP Interconnection
132kV DC OHTL — Rawaq S/S 8841 to BSP S/S 9032 (Buraydah, Qassim Area)
380kV D/C OHTL — Wadi Al-Suman 380kV BSP to Qaisumah 380kV BSP
380kV D/C OHTL — Arar BSP to Waad Shamaal BSP (Ckt 1 & 2)
Earlier Power & Substation Projects (2016–2019)
380kV Tower Erection & Stringing — Quba, Madinah, Jazan, Rabigh, Namira
Various Contracts: 4400003981 / 4400005270 / 4400005941 / 4400006412 / 4400006413
Clients: NCC, KEC, SSEM, Hazza Al-Husain Al-Samdani Est.
115kV & 132kV Network Integration Projects — Al Nariyah, Hafar Al Batin, Al Kharj, Yanbu
Contracts: 4400007278 / 4400007279 / 4400005917 / 4400010048
These projects collectively improved the Kingdom’s power transmission reliability and national grid connectivity.
Overhead Transmission Lines (OHTL)
Design, erection, stringing, and commissioning up to 400kV.
Substation Works
Civil, structural, and electrical installation.
Reconductoring & Refurbishment
Replacement of conductors and fittings on existing lines.
Civil & Infrastructure
Foundations, access roads, and bridge works.
Telecommunication Projects (STC)
Underground cable laying and fiber optic network expansion.
Nationwide Presence
Projects delivered across Saudi Arabia’s key regions, including remote and demanding locations.
Health & Safety Management
TAICON is fully committed to maintaining the highest standards of health, safety, and environmental protection across all project sites.
Trusted by Leading Clients
TAICON’s reputation is built on successful partnerships, consistent performance, and long-term trust.
Our Commitment
At TAICON, every project represents our promise — to deliver quality, ensure safety, and uphold integrity.
We continue to power progress through technical excellence and sustainable development across the Kingdom.
From design to delivery — we connect the Kingdom through power, precision, and purpose.